EnergiAcres
Skip to the project intake form

Datacloud USA · Austin · September 1–3, 2026

AI needs energy.

But why use it only once?

Power the AI.

Don't throw the rest away.

Use energy twice.

  • Compute
  • Heat
  • Food
  • Jobs
  • Community

Datacloud USA 2026 · Austin, Texas · September 1–3, 2026

Use energy twice.

AI infrastructure can produce more than compute.

EnergiAcres develops powered campuses where energy infrastructure supports AI first — then creates a second yield through thermal reuse, food production, infrastructure and community investment.

We go where the energy is.
And we help data centers get there.

  • North Central Ohio
  • Eastern Ohio
  • Southern Ohio
01

Energy

Find the energy first.

Data centers cannot wait years for theoretical power. EnergiAcres starts where firm energy, land, infrastructure and development conditions converge.

02

Power

Power AI.

Behind-the-meter generation, grid redundancy and infrastructure planning are designed around the requirements of the compute load.

Speed-to-power starts before the building.

03

Compute

The energy did its first job.

Electricity becomes computation. In a conventional campus that is where the energy conversation ends, and everything downstream of the rack is treated as a disposal problem.

04

Heat

It doesn't have to be finished.

AI infrastructure produces substantial thermal energy. When technically and economically viable, EnergiAcres designs the campus so useful thermal streams can be recovered instead of simply rejected.

05

Food

Grow food.

Recoverable energy can support controlled-environment agriculture and other productive thermal loads.

The same campus that powers intelligence can help produce food.

06

Community

Win communities.

The next generation of AI infrastructure cannot treat its host community as an externality. EnergiAcres designs local value into the campus.

Make energy count twice.

More yield from the same infrastructure.

The same energy, two designs

Don’t let the heat go to waste.

Drag to extend the same infrastructure further down the chain.

Conventional campusEnergiAcres campus
  1. Power
  2. AI compute
  3. Waste heatRejected
  4. Food / productive use
  5. Jobs / community

The energy does one job, and the rest is rejected into the atmosphere.

Where we are developing

We go where the energy is.

Today, that is leading us across Ohio.

North CentralEasternSouthern

North Central Ohio

Powered-land opportunities positioned around major energy, transportation, fiber and industrial infrastructure.

Eastern Ohio

Large-acreage opportunities positioned near Appalachian energy infrastructure and major regional corridors.

Southern Ohio

Strategic opportunities emerging around energy, advanced technology, industrial infrastructure and regional redevelopment.

You don’t have to find the energy alone.

EnergiAcres combines infrastructure intelligence, energy knowledge and local development experience to identify where data-center projects can actually work.

Site intelligence

A data center site is more than land.

  1. LandContiguous acreage with buildable geometry.
  2. PowerFirm capacity, not a queue position.
  3. GasHeader capacity and interconnect proximity.
  4. FiberRoute diversity and carrier presence.
  5. WaterSource, rights and discharge path.
  6. TransmissionSubstation distance and upgrade exposure.
  7. ZoningCurrent classification and what it permits.
  8. PermittingLocal, state and federal sequencing.
  9. CommunityHost support as a design input.
  10. CapitalStructures that survive due diligence.

The winning AI infrastructure sites are where all of these systems converge.

EnergiAcres develops from the infrastructure outward — not from the real estate inward.

Permission to build

The community has to win too.

AI infrastructure cannot just consume. It has to produce.

Food

Controlled-environment agriculture and regional food production.

Jobs

Infrastructure, technical, agricultural and operational employment.

Infrastructure

Power, roads, water, fiber and durable industrial investment.

Resilience

More productive use of energy and locally anchored infrastructure.

That is how you win communities.

Austin, Texas · September 1–3, 2026

Meet EnergiAcres at Datacloud USA 2026

Speaking

Town Hall: Overcoming NIMBYism and Expediting Permitting

Speaker
Shawn Cutter — Founder & CEO, EnergiAcres
Date
September 3, 2026
Time
2:00 – 3:00 PM
Venue
Datacloud USA Stage — Level 5

Power matters.Permits matter.Community permission matters too.

Shawn Cutter will join industry and civic leaders at Datacloud USA 2026 to discuss why the next generation of infrastructure must create durable value for the places that host it.

Project intake

What are you trying to build?

Tell us who you are and we’ll ask only the questions that matter for your side of the table.